05/07/2019
A full flood pour to get a truly level floor. Premium was used to level out precast slabs. Will be all set for the luxury vinyl tile going down in the bar and restaurant area. 5,000 sq. ft was poured in 2 hours, with no mixing on-site on a hot summer day.
——————————————
@ Cobourg, Ontario