GS Housing Group

GS Housing Group GS Housing was established in 2001 with a registered capital of 100 million RMB. as well as passed the ISO9001 management systems.

It's prefab house enterprise integrating design, manufacturing, sales and construction, there're 5 production bases in Tianjin , Guangdong, Jiangsu,Chengdu, Shenyang.... GS housing has the Class II qualification for steel structure professional contracting, Class I qualification for architectural metal (wall) design and construction, Class II qualification for construction industry (construction e

ngineering) design, Class II qualification for special design of light steel structure, and 48 national patents.

📢 We’re at EXPOMINA PERÚ 2026!The GS Housing team is now meeting mining professionals in Lima, Peru.If you are planning ...
10/09/2026

📢 We’re at EXPOMINA PERÚ 2026!
The GS Housing team is now meeting mining professionals in Lima, Peru.
If you are planning a mining camp, worker accommodation, site office or remote workforce facility, come and talk with us.
📍 Booth E221
📅 Sep. 9–11
📌 Centro de Exposiciones Jockey, Lima
Let’s talk about your real project requirements—from high-altitude conditions and transportation to workforce capacity and future camp expansion.
🤝 See you at Booth E221!
https://www.gshousinggroup.com/news/mining-workforce-accommodation-supplier-at-expomina-peru/

⛏️ We’re LIVE at Mining Indonesia 2026!! The exhibition is happening now in Jakarta, and the GS Housing team is waiting ...
09/09/2026

⛏️ We’re LIVE at Mining Indonesia 2026!!

The exhibition is happening now in Jakarta, and the GS Housing team is waiting to meet you!

We offer modular solutions for mining camps, workforce accommodation, remote site offices and emergency housing—where flexibility, fast installation and dependable site infrastructure are key to the project.

📍Hall D2 | Booth 9311
📅9-12 September 2026
📌Jakarta International Expo

Stop by our booth and let’s have a chat face-to-face if you have a mining or infrastructure project in Indonesia.
See you at booth D2-9311! 🤝
https://www.gshousinggroup.com/news/gs-housing-mining-indonesia-2026-modular-building/

🏠 Every day matters in a disaster.After catastrophic floods in Nepal, displaced communities and relief teams need tempor...
01/09/2026

🏠 Every day matters in a disaster.

After catastrophic floods in Nepal, displaced communities and relief teams need temporary shelters that are fast and reliable.

GS Housing’s flat-pack modular buildings provide a practical solution for emergency accommodation, medical facilities, relief offices, and other post-disaster needs, designed for rapid transport, quick installation, and repurposing.

Modular construction allows communities to recover faster, from emergency shelter to infrastructure. 🇳🇵

Discover Nepal’s flood relief solution:
https://www.gshousinggroup.com/news/flat-pack-modular-building-nepal/

⛏️Join GS Housing at the Kazakhstan Mining Exhibition 2026!As Kazakhstan’s mining industry moves into more remote projec...
31/08/2026

⛏️Join GS Housing at the Kazakhstan Mining Exhibition 2026!

As Kazakhstan’s mining industry moves into more remote project locations, there is an increasing need for reliable mine accommodation camps, site offices, canteens, ablution blocks, and other temporary or semi-permanent infrastructure.

GS Housing has experience in mining camp projects, including the Ush-Shoky Mine Project in Kazakhstan. We offer modular building solutions designed for the practical requirements of remote mining operations, covering everything from worker accommodation and site offices to full camp facilities.

📍 GS Housing Booth 11-212
📅 September 16-18, 2026
🏢 Atakent International Exhibition Center, Almaty, Kazakhstan

Let’s talk about your next mine accommodation, workforce camp, or remote-site infrastructure project.

👉 Meet our team in Almaty and receive practical modular solutions for your mining projects.
https://www.gshousinggroup.com/news/gs-housing-kazakhsten-kazcomak-2026/

🇵🇪 GS Housing te espera en EXPOMINA PERÚ 2026!Peru’s mining industry continues to grow in challenging and remote environ...
28/08/2026

🇵🇪 GS Housing te espera en EXPOMINA PERÚ 2026!

Peru’s mining industry continues to grow in challenging and remote environments, driving the demand for fast, durable, and flexible accommodation and site facilities.

GS Housing will showcase modular building solutions for mining projects at PERÚ 2026, such as

🏠 Workmen's Camp
🏢 Mining Offices
🍽️ Catering & Welfare Facilities
📦 Flat Pack Container Houses
🏗️ Expandable & Collapsible Container Homes

Whether you are an EPC contractor, mining company, project developer, or local construction partner, our team is ready to discuss practical modular solutions for your next project.

📅 September 9-11, 2026
📍 Jockey Exhibition Center, Lima, Peru
🎯 Stand E221

👉 Working on a mining camp or workforce accommodation project in Peru? Come see us at GS Housing at Booth E221 and discuss your project!

🔗 Read more: https://www.gshousinggroup.com/news/gs-housing-peru-expomina-2026/

🏗️ From China to France: Modular Coffee Houses DeliveredGS Housing recently supplied 3 flat-pack modular coffee house un...
26/08/2026

🏗️ From China to France: Modular Coffee Houses Delivered

GS Housing recently supplied 3 flat-pack modular coffee house units for a project in France.
For small commercial and leisure projects, the challenge is often not just the construction cost. Transport, site work, installation time, and future flexibility can also affect the project.
The French project demonstrates how a factory-prefabricated modular building can offer:
• Compact international transportation
• Fast on-site assembly
• Flexible interior layouts
• Reduced on-site construction work
• Potential for future relocation or expansion
The same modular system can be adapted for cafés, tea rooms, garden facilities, visitor centers, retail spaces, and other small commercial buildings.
A small project can also demonstrate a practical way to rethink conventional construction.
https://www.gshousinggroup.com/projects/france-modular-coffee-houses-project/

Discuss Mining Site Accommodation Camp Solution With GS Housing at Mining Indonesia Remote mining projects in Indonesia ...
21/08/2026

Discuss Mining Site Accommodation Camp Solution With GS Housing at Mining Indonesia

Remote mining projects in Indonesia come with their own challenges—tropical weather, heavy rainfall, high humidity, limited infrastructure, and long-distance transportation.

A well-planned mining camp needs to provide more than worker accommodation. Site offices, dining facilities, sanitation, welfare spaces, and other supporting facilities all need to work together.

At Mining Indonesia 2026, GS Housing will showcase modular solutions designed for remote mining and workforce accommodation projects.
GS Housing also brings practical project experience from Indonesia. Its IMIP mining camp project in Morowali, Central Sulawesi, included 1,605 modular worker accommodation units and supporting facilities.

Mining Indonesia 2026
📅 September 9–12, 2026
📍 Jakarta International Expo
📌 Booth D2-9311

Planning accommodation for a remote mining project in Indonesia? Let’s talk about your project requirements.
🔗 https://www.gshousinggroup.com/news/gs-housing-mining-indonesia-2026/

Modular Hotel Construction: Building Hospitality in a New WayHotel projects are increasingly under pressure to cut const...
18/08/2026

Modular Hotel Construction: Building Hospitality in a New Way

Hotel projects are increasingly under pressure to cut construction time while keeping quality, flexibility, and design value.

This is where modular construction of hotels provides a viable option.

Modular systems can transfer large parts of the construction process from the jobsite into the factory, from flat-pack modular hotel rooms to entire prefabricated accommodation buildings. This means that site preparation and module production can be carried out simultaneously, which can be particularly beneficial for resorts, remote tourism destinations, workforce accommodation, and phased hotel developments.

GS Housing offers modular building solutions that can fit various project needs, including flat pack modular hotels, prefabricated hotel rooms, expandable accommodation, and bespoke modular buildings.

"A right modular solution is not only about building faster. It is a matter of combining the design, manufacturing, transportation, installation, and expansion into one process.

Are you working on a hotel or lodging project?

Discover GS Housing modular hotel construction solutions:
https://www.gshousinggroup.com/news/modular-hotel-construction/

⛏️ Building Smarter Mining Camps for Remote ProjectsRemote mining projects need accommodation that can move as fast as t...
14/08/2026

⛏️ Building Smarter Mining Camps for Remote Projects

Remote mining projects need accommodation that can move as fast as the project itself.

From worker accommodation and site offices to dining halls, sanitary facilities, and supporting spaces, portable modular buildings offer a flexible way to build complete mining camp infrastructure with less on-site construction.

🌍 This September, GS Housing is bringing its portable mining camp and workforce accommodation solutions to three major industry exhibitions:

📍 Jakarta—MINING INDONESIA
📍 Lima—EXPOMINA PERÚ
📍 Almaty — CENTRAL ASIA MINING & METAL / KAZCOMAK

Planning a new mining camp or remote workforce accommodation project?
Let’s talk about your project requirements.

🔗 Learn more:
https://www.gshousinggroup.com/news/gs-housing-portable-mining-camps-exhibitions-september-2026/

🏗️ From Factory Production to Remote Oilfields—GS Housing Makes Camp Construction FasterBehind every successful oil & ga...
06/08/2026

🏗️ From Factory Production to Remote Oilfields—GS Housing Makes Camp Construction Faster

Behind every successful oil & gas project is a reliable workforce camp.

In Saudi Arabia’s challenging desert environment, companies need accommodation solutions that are

🔥 Fast to deploy
🏠 Comfortable to live in
💪 Durable in harsh climates
📦 Flexible for future expansion

GS Housing modular camps provide a complete solution for oilfield projects—from design and manufacturing to transportation and installation.

Wherever the project is located, we help build the foundation for efficient energy operations.

🌍 Modular solutions for global energy projects.
https://www.gshousinggroup.com/news/saudi-arabia-oilfield-camp-solutions/

Address

Address:NO. 540,Genghe Avenue, Genghe Town, Gaoming
Guangzhou

Alerts

Be the first to know and let us send you an email when GS Housing Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share