ARICH HPMC Factory

Website

ARICH HPMC Factory ARich Cellulose factory With 30 years of experience in producing HPMC RDP HEC PVA powder with good quality & best price!

22/10/2026

Morocco · Libya · Algeria · Tunisia · Egypt
Hot and dry conditions can challenge gypsum plaster application.
⏱️ Setting time
💧 Water retention
🧱 Workability & wall adhesion
Different raw materials. Different site conditions. Different formulations.
ARICH provides customized gypsum mortar formulas and additive optimization.

21/10/2026

📦 October 21, 2026 | 25 MT RDP Ready for Shipment to Brazil 🇧🇷

All 25 MT of RDP have completed quality inspection and are ready for shipment to Brazil.

Another regular working day at ARICH — checking the goods, preparing the shipment, and making sure everything is ready before dispatch.

Source factory · Authentic delivery · Quality assurance, look for ARICH CELLULOSE®

Direct from the factory. Real shipments. Quality you can rely on.

20/10/2026

Raw materials are arriving at the factory,
and production keeps moving forward.

From unloading and storage
to the next stage of production,
each batch enters the corresponding process.

Production doesn’t start with the finished product.
It starts when the raw materials arrive.

A real look at daily production at ARICH.

📱 WhatsApp: +86 18533252830

19/10/2026

No cuts. One take. Real factory footage! 🎥

Step inside ARICH and take a closer look at our PP Fiber production line.

No staged scenes—just a real look at our manufacturing operations. Follow ARICH for more factory updates, construction additives, and application solutions.

📩 Contact us for product details and cooperation.
🌐 www.arichcellulose.com
📱 WhatsApp: +86 18533252830

15/10/2026

Our RDP powder production schedule has been busy lately.

As one batch is completed,
the next order is already being arranged.

Production, packing and order preparation
continue step by step.

Orders keep coming. Production keeps moving.

That’s the current production rhythm at ARICH.

ARICH CELLULOSE®
Building Additives & Formulation Solutions

📱 WhatsApp: +86 18533252830
🌐 www.arichcellulose.com

15/10/2026

The Real Cause of Pinholes in Self-Leveling Floors
Pinholes and pockmarks are not always caused by the material itself.
Insufficient substrate sealing or improper primer application can allow air to escape, affecting the final surface.
Proper substrate preparation is the first step toward a smoother floor.
💬 What challenges have you encountered in self-leveling applications?
🌐 www.arichcellulose.com
📱 WhatsApp: +86 18533252830

The concrete was watered regularly. So why did it still crack?This is a common situation on hot-weather jobsites.Concret...
14/10/2026

The concrete was watered regularly. So why did it still crack?

This is a common situation on hot-weather jobsites.

Concrete is watered regularly after placement, yet fine cracks still appear on the surface.

Does this always mean the curing was insufficient?

Not necessarily.

Hot-weather concrete curing is not only about moisture. Temperature, watering timing, and moisture-retention methods also matter.

☀️ What happens when hot concrete is suddenly exposed to cooler water?
💧 Why can covering help with moisture retention?
🏗️ How can placement timing affect curing conditions?

👉 Read our latest article to explore the key factors behind summer concrete curing.

ARICH CELLULOSE®
WhatsApp: +86 18533252830
Website: www.arichcellulose.com

14/10/2026

From raw materials entering the factory
to production, testing, packing and final shipment,
every step follows a defined process.

Raw materials are inspected.
Production is controlled.
Finished products are tested.

We focus not only on the final product,
but also on how it is produced step by step.

From Raw Materials to Finished Products — Every Step Under Control.

ARICH CELLULOSE®
Building Additives & Formulation Solutions

📱 WhatsApp: +86 18533252830
🌐 www.arichcellulose.com

13/10/2026

It flows well right after mixing.
Does that mean the self-leveling formulation is performing well?

Not necessarily.

A proper test also looks at what happens over time.

We check the initial flow,
then test the flow again after 20 minutes.

We also observe:

Flowability | Stability | Segregation | Water Separation

Because self-leveling mortar needs more than good initial flow —
it also needs to maintain a stable system.

Real test results tell us more than first impressions.

ARICH CELLULOSE®
Building Additives & Formulation Solutions

📱 WhatsApp: +86 18533252830
🌐 www.arichcellulose.com

https://www.arichcellulose.com/en/news/890245286009372734.htmlWhy are cracks in concrete pavements often transverse?As c...
13/10/2026

https://www.arichcellulose.com/en/news/890245286009372734.html
Why are cracks in concrete pavements often transverse?

As concrete hardens, it undergoes drying shrinkage and thermal movement, while the pavement slab is also restrained by the underlying base. When this movement is restricted, tensile stress can build up and lead to transverse cracking.

But remember: a transverse crack does not automatically mean a pavement defect.

Transverse contraction joints are intentionally designed to provide a controlled location for concrete movement.

When evaluating a crack, look at:
🔹 Is it located at the designed joint?
🔹 Were the saw-cut timing and depth appropriate?
🔹 Are there signs of faulting, spalling, edge damage or loss of support?

The direction of a crack is only part of the story. Understanding the cause is what really matters.

ARICH CELLULOSE®
Building Additives & Technical Solutions
📱 WhatsApp: +86 18533252830
🌐 www.arichcellulose.com

Address

Xinhua District
Shijiazhuang
050000

Alerts

Be the first to know and let us send you an email when ARICH HPMC Factory posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share