Bylok Build

Bylok Build 🔨👷‍♂️ Caravan Salon Builder.

Photos are of the new interior transformation. Last post showed it ready and usable for Wedding hair styling, managed on...
27/09/2020

Photos are of the new interior transformation. Last post showed it ready and usable for Wedding hair styling, managed one job, great! But along came Covid... So we decided best to take it in another direction, fitting it out as a fully functioning Hair Salon!
Adding now the wall hung cabinets, wash hair basin and a small sink with a tap, as well as a Hot water cylinder.

-1 cabinet with a small sink and tap. Removable bench top cut out, at the sink area.
-1 cabinet with a shelf and a hinged bench top cut out, for the wet towel drop.
-1 small wall mounted cabinet with LED strip light.
-1 floor mounted cabinet for the wash hair basin/seat squabs, also housing the hot water cylinder and plumbing.

Our first day out (14/3/20) and first actual job for the Caravan! 🎉🍾 This was built to be used as mobile Wedding Hair va...
03/04/2020

Our first day out (14/3/20) and first actual job for the Caravan! 🎉🍾 This was built to be used as mobile Wedding Hair van for my wife's business. It performed extremely well and exceeded all our expectations! Thanks for all the support and thanks to those who were part of this project/journey..
Miss Marlo & Co
Images by www.gregcampbell.photo

The finishings off stages- Paint, Floor sanding, skirting and Architraves, bench seat build and the electrical. 🍾Couple ...
17/11/2019

The finishings off stages- Paint, Floor sanding, skirting and Architraves, bench seat build and the electrical. 🍾
Couple wall hung cabinets to make and signwriting, then completed.😊

Ply lining completed with a negative detail finish..👍 one sheet at time.😒 Glued and temporally braced to cure then move ...
24/04/2019

Ply lining completed with a negative detail finish..👍 one sheet at time.😒 Glued and temporally braced to cure then move on to the next. Definatly time consuming with so much too beware of.., probably wise I was able to be patient and i avoided nailing my finger again 😂. So not too much of this 🤬 was going on this time round.😂

Big job installing EVA foam Insulation,  glued between the framing to the Exterior wall and ceiling ply. Now..... I'm re...
26/01/2019

Big job installing EVA foam Insulation, glued between the framing to the Exterior wall and ceiling ply. Now..... I'm ready for the ply lining☝️👍

I have now successfully installed window struts and window and door Hardware. Also carefully completed electrical pre wi...
29/09/2018

I have now successfully installed window struts and window and door Hardware. Also carefully completed electrical pre wire. Phew... getting close now to lining.

I installed Windows struts and window and door Hardware and Electrical pre wire completed. Next is Aluminum Insulation
29/09/2018

I installed Windows struts and window and door Hardware and Electrical pre wire completed. Next is Aluminum Insulation

Cedar windows and facing boards done🔨👍.
25/07/2018

Cedar windows and facing boards done🔨👍.

Stage 7 •Membrane paint. -2 base coats black. -4 top coats white
05/07/2018

Stage 7
•Membrane paint.
-2 base coats black.
-4 top coats white

Stage 6• Ply cladding to walls and roof.• filler and sand ready for membrane paint.
04/07/2018

Stage 6
• Ply cladding to walls and roof.
• filler and sand ready for membrane paint.

Stage 5•Frame and shape up new walls and curved roof.
03/07/2018

Stage 5
•Frame and shape up new walls and curved roof.

Address

Matakana

Telephone

0210480795

Website

Alerts

Be the first to know and let us send you an email when Bylok Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Bylok Build:

Share