24/01/2024
https://youtu.be/YgE-FTvRtIQ?si=jF_kU5yWjW2p9nFZ
Bridge parapet removal using Echidna D3HS-W concrete saw.
The W means 'through-hub water distribution' which is the latest development in Echidna's continuing program of product improvement.
The through hub water distributes the cooling water more effectively, reducing water consumption and slurry production, while increasing blade life and cutting rates.
This project in this video involves cutting 1km of bridge parapet over roads, walkways, residential buildings and the Vltava river
The reconstruction of a railway bridge in Prague included the removal of the reinforced concrete parapet with a cornice on both sides of the bridge. The cont...