10/05/2026
In 2023, plans for the construction of a new spine road, connecting Whitsbury Road and the A338 Salisbury Road, in Fordingbridge, Hampshire, were confirmed.
Located on existing floodplains, the construction of the new road necessitated an important flood alleviation element, meaning the road would need to be built roughly two and a half metres above pre-existing ground level and culverts would need to be incorporated into the design to prevent flooding.
We were delighted to work alongside contractor R&W Langley and via our merchant partner Keyline Civils Specialist to supply 1200mm diameter Ridgistorm-XL for the project.
Read more about our involvement in our latest case study: https://bit.ly/3QDWazs