19/10/2026
Passing inspection shouldn't feel like a guessing game.
Nobody wants a call-back over a waterproofing detail that could've been sorted at the supply stage.
Our shower systems are designed with correct falls, tested waste configurations, and NZ Building Code requirements in mind, so what goes in the wall matches what needs to come out the other side at sign-off.
➡ Consistent, tested tray and waste systems
➡ Configurations that work with tiled walls AND acrylic liners
➡ Clear specs, so nothing gets lost between supplier and site
Fewer questions from the inspector. Fewer comebacks for you.
What's the one compliance detail you always double-check on a shower install?