The construction of data centres is accelerating sharply, driven by the surging demand for cloud services, artificial intelligence workloads and the ever-expanding digital infrastructure that underpins modern life.
What does this mean? Speed to commissioning is everything.
On major data centre projects, excess moisture within concrete slabs can become a critical constraint, delaying the installation of waterproofing membranes, coatings or flooring systems and creating programme risk during key construction phases.
At the Surfside EC4 data centre at Eastern Creek, NSW, the construction programme required a moisture control solution that would address these risks without introducing additional curing periods, recoating requirements or surface-applied barriers that could slow progress.
Download the case study to learn more about the solution and the results! https://bit.ly/4uNPyO5