Fahstwall Systems Mindanao

Directions Website

Fahstwall Systems Mindanao Est. 2023 |FahstWALL Systems–Mindanao

An official verified page for FahstWALL Systems Davao Plant. China-Philippines Wall Tech Systems Inc. Suico., Brgy.

This page is exclusive for Mindanao clients under the second manufacturing plant - Mindanao Innowall Corporation & FahstWALL Davao City Office-Gallery. and Mindanao Innowall Corp is engaged in the manufacture and distribution of high-quality prefabricated wall panels under the brand name “FahstWALL Systems”. It is Philippine made and Filipino owned with its first plant located at B. Tingub, Mandaue City, Cebu. Second Plant is in Brgy. Tagpore, Panabo Davao Del Norte.

30/09/2026

🔥 3 HOURS. 3 WORKERS. FIREWALL EXTENSION DONE.

Existing CHB wall wasn't high enough—especially with neighboring houses built very close behind the property.

The solution? Extend the wall using 75mm FahstWALL Systems Panels.

📍 Yati, Liloan, Cebu
🧱 6 pcs FahstWALL Panels
👷 3-person installation team
⏰ Started: 1:00 PM
✅ Finished: 4:00 PM

And yes—that 3-hour work period already included cutting, hauling and installation.

No need to rebuild the existing CHB wall. FahstWALL was installed above it to create the additional firewall height needed.

Build faster. Build smarter. Build with FahstWALL Systems.

Message us for product inquiries, estimates and project requirements.

29/09/2026

🚨 LAST CHANCE TO SAVE UP TO ₱39,000! 🚨

Our FahstWALL Systems 9th Anniversary Limited Offer until October 18, 2026!

Secure your TYDD2 Anniversary Voucher, including discounts worth up to ₱39,000 and other exclusive vouchers.

✅ Fully pay your confirmed order on or before October 18
✅ Your order and qualified TYDD2 voucher will be secured
✅ Schedule the release or delivery of your reserved panels until December 20, 2026

You don’t need to get your panels immediately reserve and fully pay now, then schedule your order based on your project timeline.

⏳ Limited time only. Once the promo ends, the anniversary offer ends too!

✉️ Message FahstWALL Systems today to confirm your order and secure your TYDD2 voucher.

Terms and conditions apply. Voucher entitlement depends on the qualified order.

23/09/2026

🏗️ ADDING ANOTHER FLOOR? WALL WEIGHT MATTERS.

This ongoing school project in Digos, Davao del Sur originally used CHB walls on the lower ground floor. When the building was extended to the second floor, FahstWALL Systems Lightweight Concrete Precast Panels were selected to help reduce the additional wall load on the structure.

Every wall added to an upper floor becomes part of the building’s permanent dead load. Using a lightweight walling system can help lessen this added weight while providing durable, solid, and faster-to-install wall partitions.

✅ Lighter than conventional CHB wall construction
✅ Helps reduce additional wall dead load
✅ Faster and cleaner installation
✅ Ideal for upper-floor extensions and renovation projects

For building extensions, don’t consider space alone—consider the weight you are adding to the structure.

Choose a smarter walling solution. Choose FahstWALL Systems.

Final wall specifications and structural suitability must be confirmed by the project’s licensed structural engineer.

21/09/2026

EVERY DAY YOUR CONSTRUCTION IS DELAYED,
YOUR EXPENSES CONTINUE TO RISE.

When fuel, electricity, labor, food, and construction costs are putting pressure on every budget, can your commercial project still afford a slow walling system?

Every day your construction is delayed, your expenses continue to rise.

More working days mean more labor costs, longer equipment use, extended site operations, and a later opening for your business.

In today’s economy where fuel, electricity, food, labor, and construction costs continue to pressure every budget building the traditional way may cost more than materials alone.

For this commercial building, FahstWALL Systems provides a faster and more efficient walling solution helping reduce installation time, lessen labor requirements, and keep the project moving toward an earlier completion.

Because in commercial construction, time is not only money.

Every day saved brings your business one day closer to opening.

Build faster. Control construction costs. Open sooner.

Build with FahstWALL Systems.

19/09/2026

Beyond construction, we believe in building connections that help industries and businesses grow. 🇵🇭

FahstWALL Systems is grateful to have been part of the 1st RCEP Business and Investment Summit – “Business in the RCEP Economy: Competing, Connecting, and Scaling Across East Asia,” held in Manila.

We extend our appreciation to the organizers, partners, business leaders, and industry representatives who came together to exchange ideas and strengthen opportunities for collaboration and growth across East Asia.

We are also proud of the participation and leadership of our Vice President, Mr. Jay Yuvallos, whose involvement as Chairman reflects a commitment that goes beyond our own industry supporting conversations and initiatives that contribute to the growth of Philippine businesses and the wider business community.

Thank you for allowing FahstWALL Systems to be part of a platform that connects industries, ideas, and opportunities for the future.

Building walls is what we do. Building connections for progress is part of what we stand for.

🏠 The Housing Backlog Is More Than a Number It Represents Millions of Filipino Families Still Waiting for a Home.Address...
18/09/2026

🏠 The Housing Backlog Is More Than a Number It Represents Millions of Filipino Families Still Waiting for a Home.

Addressing this challenge requires more than building additional houses. We need construction solutions that are faster, more efficient, durable, and scalable.

With FahstWALL Systems, developers and builders can accelerate wall construction while maintaining strength, quality, and long-term value helping turn housing plans into homes sooner.

Because every wall completed brings another Filipino family closer to having a place they can finally call home. 🇵🇭

Build faster. Build smarter. Help bridge the housing gap with FahstWALL Systems.

📩 Message us to learn more about our wall panel solutions for housing developments.

17/09/2026

Still struggling with project delays and turnover problems?

Residential Project in Sto. Tomas, Davao del Norte combining FahstWALL Systems Panels with an I-Beam Structure.

Clean cuts. Proper alignment. Malinis at precise ang installation.

✅ Panel-to-steel connection: welded
❌ Panel-to-panel joint: hindi welded

Sa panel joints, kailangan ng proper seismic gap, backer rod, at paintable rubberized or PU sealant. These materials help accommodate movement caused by ground shaking and structural vibration—reducing the risk of hairline cracks along the joints.

Hindi lang mabilis ang installation. Dapat tama rin ang bawat connection at finishing detail.

Steel structure? FahstWALL can work with it.

📍 Sto. Tomas, Davao del Norte
🏠 Residential Project

Address

NR-A 1, Buhangin Grand Complex, Km. 6 Davao City Diversion Road, Buhangin, Davao Del Sur
Davao City
8000

Alerts

Be the first to know and let us send you an email when Fahstwall Systems Mindanao posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share