𝐋𝐢𝐦𝐢𝐭𝐞𝐝 𝐚𝐜𝐜𝐞𝐬𝐬 𝐨𝐧 𝐬𝐢𝐭𝐞 𝐜𝐚𝐧 𝐭𝐮𝐫𝐧 𝐭𝐚𝐧𝐤 𝐞𝐫𝐞𝐜𝐭𝐢𝐨𝐧 𝐢𝐧𝐭𝐨 𝐚 𝐦𝐚𝐣𝐨𝐫 𝐥𝐨𝐠𝐢𝐬𝐭𝐢𝐜𝐬 𝐜𝐡𝐚𝐥𝐥𝐞𝐧𝐠𝐞. 🏗️
In a project near Bologna, Italy, Ecoacciaio srl used the Nordweld system for the construction of 2 biogas tanks.
✅ The key challenge was the very limited access to the er****on area, which had a direct impact on material handling, crew organisation and the sequence of operations.
The applied system enabled the entire tank to rotate during construction, which made it possible to feed material from one location and organize the successive er****on stages more efficiently. This helped reduce logistics operations around the tank, improve the use of limited working space and reduce interference with nearby works.
✔️ The project also used rotation and positioning welding equipment, including rotating fixtures, turntables and a mobile welding station. As a result, the er****on process became more structured, welding conditions more stable, and the entire ex*****on better adapted to the real limitations of the site.
𝐑𝐞𝐚𝐝 𝐭𝐡𝐞 𝐟𝐮𝐥𝐥 𝐜𝐚𝐬𝐞 𝐬𝐭𝐮𝐝𝐲 𝐨𝐧 𝐨𝐮𝐫 𝐛𝐥𝐨𝐠:
🔗 https://tiny.pl/3brbzh_8z
𝘛𝘩𝘦 𝘱𝘩𝘰𝘵𝘰𝘴 𝘢𝘳𝘦 𝘱𝘶𝘣𝘭𝘪𝘴𝘩𝘦𝘥 𝘸𝘪𝘵𝘩 𝘵𝘩𝘦 𝘤𝘰𝘯𝘴𝘦𝘯𝘵 𝘰𝘧 𝘰𝘶𝘳 𝘤𝘭𝘪𝘦𝘯𝘵 – 𝘌𝘊𝘖𝘈𝘊𝘊𝘐𝘈𝘐𝘖 𝘚𝘳𝘭