06/02/2026
Begun in 2015, the Honolulu Skyline automated rail transit system project includes 18.9 miles of elevated guideway across 19 stations. The motivation for this monumental project was Honolulu's notoriously bad traffic; the result would be a cleaner, safer, and more efficient way to move around the island from East Kapolei to downtown Honolulu.
Stainless steel metal fabric was specified for the guardrail system because of its low-maintenance, durable qualities, as well as the ability to protect passengers without blocking the views.
🚉 Explore more of how 32,426 square feet of Potomac weave mesh worked in this rail system: https://bit.ly/4ccTCRQ