Update on our building project on Algoa Road. A lot of square feet (and cubic yards) of concrete was dump on the ground and finished yesterday, another part of the back deck, part of the driveway, front porch and sidewalk. Special Thanks to all of the guys with JLL Construction for doing what they are doing. This is a great bunch of guys that work great together. Also, a special thanks to Nates Concrete Pumping for putting the concrete where it needed to be. The Guys at SIPS of America are working on the Structural Insulated Panels that will serve as the exterior walls and 2 cross walls for this structure, Mike at Mid America Truss has the roof trusses in the works as well. The walls and trusses will be the next big step in this project.