10/16/2026
https://youtu.be/eAFxCeTkTbE
**ACI doesn't know how to cure Type IL cement. They put that in writing, and they're still blaming you.**
Type IL is in nearly every truck on the job site right now. Here's what the industry's own curing guide, ACI 308, says about it: curing methods for this cement are **" being studied." ****
Read that again. They're still studying it while you're out there pouring it, finishing it, and signing your name to it.
Their curing table doesn't list it. Type IL-only answer for blended cement; it's one word: "Variable. That's the exact number you need, and it's the one they won't give you.
And when that slab scales, crazes, or cracks? The cement producer only answers for the powder, and the committee answers for nothing. **That leaves you, the guy who never picked the cement. ****
They tell you to fog "properly" and "frequently," with no interval and no number.
They say strength doesn't prove a slab was cured, then end curing at 70% strength anyway.
They admit there's no standard test for the surface, the part that decides whether a slab lasts.
They can't tell you how to cure it, they can't test whether you did, and they'll still hang it on you.
We tore ACI 308 apart chapter by chapter, using nothing but their own words. **Enough is enough.**
This is just the start. We'll be releasing a walk-through chapter, with ACI 308 and our breakdown side by side.
If you pour, finish, or cure concrete, watch this before your next Type IL pour:
https://youtu.be/eAFxCeTkTbE
**Want the full breakdown documents? **** Send us a message or comment below, and we'll get them to you.
Quit taking the fall for a guide that doesn't have the answers. How are you ever going to be able to trust the docugoing to ment when they say they've got it figured out? A lot of trust has been broken in the last few years with the release of this material; sometimes it can't be rebuilt.